The laying of ground cable trays is a professional electrical engineering task that mainly involves the following steps and requirements:

1. Design and preparation: Firstly, it is necessary to design cable trays based on the building's electrical requirements and spatial layout. Factors such as cable routing, bridge material, size, support structure, and fire prevention measures need to be considered. The preparation process also needs to consider construction conditions, safety regulations, and regulatory requirements.  

2. Installation of support structure: Install the support structure of the cable tray according to the design requirements. Usually, metal or wooden brackets are used to fix the bridge to the wall or ceiling to ensure its stability and load-bearing capacity.  

3. Laying cable tray: Install the cable tray on the supporting structure. Cable trays are usually made of metal or plastic materials, which can flexibly adapt to different environments and spatial shapes. During the laying process, it is necessary to ensure that the cable tray is straight, firmly fixed, and avoid twisting or sliding.  

4. Fire prevention measures: Fire prevention measures must be considered during the installation of cable trays. Fireproof coatings or fire-resistant materials can be added or wrapped to prevent cables from being damaged or short circuited in a fire.  

5. Connection and testing: After laying, it is necessary to connect the cable tray to other parts of the power system. This process requires professional electricians to operate to ensure safety and reliability. After the connection is completed, testing and verification are required to ensure the normal operation and safety of the cable tray.  

When laying ground cable trays, the following precautions should be taken:

1. Ensure that the installation of cable trays complies with relevant regulations and safety standards, such as electrical installation codes, building fire prevention codes, etc.  

2. During the installation process, it is necessary to protect cables and other equipment from the risk of damage or short circuit.  

3. During the installation process, it is necessary to maintain cleanliness and tidiness to avoid the impact of dust, debris, or other pollutants on the cable tray.  

4. During the connection and testing process, it is necessary to use appropriate tools and materials to ensure the accuracy and safety of the work.  

5. After installation, testing and verification are required to ensure the normal operation and safety of the cable tray.  

Overall, the laying of ground cable trays requires professional skills and knowledge to ensure the accuracy and safety of the project.